Power Infrastructure

Transformers, switchgear, UPS, PDUs, busbars and ATS or STS. Power carries the longest lead times in the build, so lock it early and size it to real IT load plus headroom.

Free to quote · priced in ~1 business day
Compare
Vertiv

Rack PDU 415V 60A

415V · 60A · metered vertical

16–20 wkNew · Used · Refurb

From $1,180 / unit

Min order 4 units

Compare
ABB

UniGear MV Switchgear

medium-voltage · 12–24 kV · arc-proof

16–20 wkNew · Used · Refurb

From $124,000 / unit

Compare
Vertiv

Liebert EXL S1 UPS

transformer-free · 1200 kVA · 97.5%

14–16 wkNew · Used · Refurb

From $118,000 / unit

Compare
Eaton

93PM UPS 500 kW

modular · 500 kW · scalable

12–14 wkNew · Used · Refurb

From $74,000 / unit

Compare
Raritan

PX3 Metered rPDU

400V · 32A · networked metered

6–8 wkNew · Used · Refurb

From $1,080 / unit

Min order 4 units

Compare
Starline

Track Busway 800A

overhead busway · 800A · tap-off

10–12 wkNew · Used · Refurb

From $540 / unit

Min order 4 units

Compare
ABB

DPA 250 S4 UPS

modular · 250 kW · decentralized

10–12 wkNew · Used · Refurb

From $42,000 / unit

Compare
Vertiv

Geist Switched rPDU

415V · 60A · per-outlet switched

6–8 wkNew · Used · Refurb

From $1,380 / unit

Min order 4 units

Buying guide

Choosing equipment in Power Infrastructure

Lock long-lead power first, transformers and switchgear run 16–20+ weeks; sequence them ahead of compute.

Size to IT load plus headroom, UPS and PDU ratings should cover real draw and planned growth.

Confirm the utility feed, voltage, phase and redundancy drive switchgear and ATS/STS selection.

Match distribution to racks, busbar and rPDU amperage follow rack density and connector type.

Want a second opinion on a build?

Our engineers scope power, cooling and compute together. No payment, and quotes come back in about a business day.

Talk to an engineer