Transformers, switchgear, UPS, PDUs, busbars and ATS or STS. Power carries the longest lead times in the build, so lock it early and size it to real IT load plus headroom.
415V · 60A · per-outlet switched
From $1,450 / unit
Min order 4 units
overhead busway · 800A · tap-off
From $560 / unit
Min order 4 units
Lock long-lead power first, transformers and switchgear run 16–20+ weeks; sequence them ahead of compute.
Size to IT load plus headroom, UPS and PDU ratings should cover real draw and planned growth.
Confirm the utility feed, voltage, phase and redundancy drive switchgear and ATS/STS selection.
Match distribution to racks, busbar and rPDU amperage follow rack density and connector type.
Our engineers scope power, cooling and compute together. No payment, and quotes come back in about a business day.